14 DECEMBER 2018
Turboden Installs ORC System at Croatia Geothermal Plant
The largest Organic Rankine Cycle system in Europe is now operational at a geothermal power plant in Croatia. The 17.5 MW system has been installed at the Velika Ciglena plant by Italian company Turboden for Turkish customer Geoen-MB Holding.