Nicolas Cuenot
Engineer responsible for the Soultz power plant operation for ES-Géothermie, France
As operator of the power plant, ES-Géothermie really appreciates the very easy handling of the ORC unit that we can manage most of the time on our own. If assistance is required, the support team of Turboden is usually very responsive. Moreover, we truly believe that the actual, remarkable performances of the Soultz-sous-Forêts geothermal power plant are the results of a very fruitful collaboration between the Turdoden staff and the Soultz team at every steps of the project: construction, commissioning and current exploitation.
1.7 MWe, start-up: July 2016