Turboden Installs ORC System at Croatia Geothermal Plant

14 December 2018

The largest Organic Rankine Cycle system in Europe is now operational at a geothermal power plant in Croatia. The 17.5 MW system has been installed at the Velika Ciglena plant by Italian company Turboden for Turkish customer Geoen-MB Holding.

Return top